Commercial ServicesCurtain Walling
Curtain walling is the most visible part of a commercial building and the least forgiving to get wrong. It carries wind load, controls heat loss and has to stay watertight for decades, while every trade that follows works around it.
AGS design, supply and install aluminium curtain walling for offices, retail, industrial, education and community buildings across the UK. Retail glazing experience, applied properly.
Why Choose Curtain Walling for a Commercial Property?
Curtain walling does what masonry and windows cannot: it wraps a building in continuous glass. As a non-load-bearing facade fixed back to the structure, it spans floor to floor with slim aluminium framing, so you get natural light deep into the floor plate, clear views out and a frontage that says the building is worth taking seriously.
Done properly, it also performs. Modern thermally broken systems control heat loss, manage condensation and take real wind loads. The glass does the rest: solar control, acoustic reduction, and security specifications where the ground floor needs them. That holds from office headquarters to industrial units: if the front of the building is glass, it has to perform.
The catch is that curtain walling only works as well as its design. Deflection, drainage, interfaces with the roof and the frame: this is where facades fail, and it is exactly what we check at survey. Good glazing starts long before the installers arrive.
Our Commercial Curtain Walling Systems
We install stick system curtain walling from Schüco and Senior Architectural Systems: two of the most proven aluminium systems in the UK, chosen to suit the building rather than a one-brand habit. Capped systems give the classic framed grid. Structural silicone glazing removes the external cap for a seamless glass finish. Sloped and roof glazing carries the same system over atriums and glazed roofs.
On thermal performance, our double glazed units achieve a centre pane U-value of 1.0 W/m²K and triple glazing reaches 0.6 W/m²K, which is where Part L conversations start rather than end: the whole facade calculation depends on framing ratio and glass specification, and we will be straight with you about both.
Framing is polyester powder coated to any RAL or British Standard colour, including dual colour inside and out. Doors, windows and shopfronts integrate into the same elevation, engineered as one package.
Curtain Walling Questions, Answered Straight
Got drawings for a curtain walling package?
Send them over. We will price what is drawn, tell you what is missing and flag anything that will cause problems on site.
Curtain walling is priced per project, not off a rate card, because the same elevation can double in cost with the wrong assumptions. The main drivers are the system and configuration (capped stick systems cost less than structural silicone glazing), the glass specification (solar control, acoustic and security glass all add cost), height and access (scaffold, MEWPs or mini-cranes), and the interfaces: copings, cills, firestopping and how the facade meets the frame. Send us your drawings and we will price what is actually there, tell you what information is missing and flag the details that usually catch projects out. If you want the cheapest quote, we are probably not the right company. If you want the number to survive to handover, we are worth speaking to.
Our double glazed curtain walling achieves a centre pane U-value of 1.0 W/m²K, and triple glazing reaches 0.6 W/m²K. Treat those as the starting point rather than the compliance answer: Building Regulations Part L works on the whole facade, so framing ratio, spacer bars and glass specification all move the final figure. A capped stick system with sensible spans and the right units will meet Part L comfortably on most commercial buildings; where the design pushes glass areas harder, triple glazing or higher-specification coatings close the gap. We will tell you at design stage what the facade will actually achieve, not just quote the best number in the brochure.
Capped curtain walling holds the glass with external pressure plates and cover caps, giving the classic framed grid and the simplest, most economical build. Structural silicone glazing (SSG) bonds the glass to the frame so the outside face reads as continuous glass with slim shadow joints and no visible caps. SSG costs more and demands more: the bonding is factory controlled, replacement glass takes longer, and the design has to be right because there is no cap to hide a tolerance problem. Which is right depends on the building, the budget and the look the architect is after. We install both, and we will tell you honestly when the cheaper option is the better one.
We work with Schüco and Senior Architectural Systems, two of the most proven aluminium curtain walling systems available in the UK, both tested to BS EN 13830, the product standard for curtain walling. Which system we recommend depends on the project: spans, thermal targets, budget and how the facade interfaces with doors, windows and shopfronts on the same elevation. Because we install both, the recommendation follows the building rather than a supplier agreement. Whichever system is used, the survey, fabrication drawings and setting out are ours, and that is where facade quality is actually decided. The survey, the detail, the supplier and the installer all matter.
Yes, and on most projects the design work is the difference between a facade that performs and one that leaks. We take curtain walling from survey and setting-out drawings through fabrication to installation and handover. That includes the unglamorous questions: how much the structure will deflect and where that movement goes, how the facade drains, how it meets the roof, the slab and the adjacent cladding, and what happens at the fire barriers. Shopfitters and main contractors use us because we answer those questions before the glass is ordered, not after it arrives. Good glazing starts long before the installers arrive.
The site work is usually the short part. The programme is driven by design sign-off and procurement: survey and fabrication drawings first, then framing and glass on manufacturer lead times, which vary by system, finish and glass specification. Non-standard colours, oversized units and specialist glass all add weeks, so the earlier we are involved, the more programme we can protect. What we will not do is give you a start date we cannot hold. Once on site, a typical elevation goes in quickly and in sequence with the trades around it. If your opening date depends on the glazing being right, tell us the date and we will build the programme back from it.
AGS are based in Halifax, West Yorkshire, and install curtain walling across the UK. Recent commercial glazing work runs from Edinburgh to Oxford, with regular projects across Yorkshire and the North West. For national retail and commercial clients that matters: the same team, the same standard and the same accountability on every site, rather than a different local subcontractor each time. Our reputation has been built on repeat business, not sales talk, and repeat business only happens when the second site is finished as well as the first.
It depends on the height and what the frame has to carry. Shopfront framing suits single-storey elevations with normal glass sizes: it is lighter, cheaper and quicker to install. Curtain walling earns its cost when the glazing runs past one storey, spans floor to floor, carries larger glass or has to meet tougher wind loads and thermal targets. On many buildings the honest answer is a mix: curtain walling where the elevation demands it, shopfront framing or commercial windows where it does not, and structural glazing where the design wants no visible framing at all. We install all of them, so the recommendation follows the building, not the product we happen to sell.
Most of our curtain walling is delivered for main contractors and shopfitters, and the working relationship is built around what they actually need: fabrication drawings that answer questions rather than raise them, realistic lead times stated up front, RAMS and the site paperwork sorted before anyone has to chase them, and installers who turn up when the programme says they will. We report problems early, because on a commercial programme bad news late is what costs money. If you are pricing a package for a tender, send us the drawings and we will give you a number you can rely on. We do not compete for scraps. We compete on service, quality and getting the job right.